Blende Silver Corp. Secures Five-Year Class 3 Mining Land Use Approval for Flagship Blende Project in Yukon

Blende Silver Corp. received a five-year Class 3 Quartz Mining Land Use Approval for its Blende Project, de-risking advanced exploration and positioning the company for multi-season drill programs at the largest carbonate-hosted silver-zinc-lead deposit in Yukon.

Dallas Metrowire Staff
Business
Blende Silver Corp. Secures Five-Year Class 3 Mining Land Use Approval for Flagship Blende Project in Yukon

Blende Silver Corp. (TSX.V: BAG) (OTC: BAGGF) announced that the Yukon Department of Energy, Mines and Resources has granted a Class 3 Quartz Mining Land Use Approval (Approval No. LQ00608) for its 100%-owned Blende Silver-Zinc-Lead Project in north-central Yukon. The approval is effective July 13, 2026, and valid through July 12, 2031, providing a five-year permitting window for advanced exploration across all 260 quartz claims comprising the project.

The Class 3 approval represents the final major permit required for the Company to execute its planned multi-year exploration programs. Highlights include diamond drilling approval across the project area, an operating season from February 1 to September 15 annually, camp facilities for up to 50 persons supporting up to 11,300 person days of work, a permitted airstrip (25,000 m2), upgrading of 5 km of existing access and construction of 2 km of new road, winter access via the Wind River Winter Road, and on-site fuel storage.

Andrew H. Rees, President and CEO, stated: “This approval is a major de-risking milestone for Blende Silver. With a five-year Class 3 permit in hand covering the entire claim package, the Company now has the regulatory certainty to plan and execute sustained, multi-season drill programs at what is the largest carbonate-hosted silver-zinc-lead deposit in Yukon. The permitted airstrip and camp infrastructure will materially improve the efficiency and cost profile of our field operations. Combined with the district-scale targeting work currently underway with Ronacher McKenzie Geoscience, Blende is now positioned to advance aggressively toward resource growth.”

The Company acknowledges the First Nation of Na-Cho Nyak Dun, on whose traditional territory the Blende Project is located, and looks forward to continued engagement and communication as exploration programs advance. The Company is committed to responsible exploration, progressive reclamation, and full compliance with all conditions of the approval, including wildlife, heritage, and environmental protection measures.

The Blende Project hosts the largest carbonate-hosted silver-zinc-lead deposit in the Yukon, as documented in M. Robinson and C.I. Godwin, Economic Geology 1995. A mineral resource estimate prepared in accordance with National Instrument 43-101 at a 1.5% ZnEq cutoff was disclosed in the Company’s news release dated May 20, 2021. The estimate was prepared by Sue Bird, P.Eng., of Moose Mountain Technical Services, and is based on metal price assumptions including silver at US$26 per ounce, zinc at US$1.30 per pound, and lead at US$1.00 per pound. Metal prices have changed since the effective date, and the estimate has not been updated to reflect current prices.

Historical exploration defined the East and West Zones, two primary mineralized zones located approximately two kilometers apart. With the Class 3 approval in hand, the Company intends to plan and advance exploration programs across the Blende Project over the coming seasons, subject to the conditions of the approval and applicable regulatory requirements.

Blende Silver Corp. is a Vancouver-based junior resource company focused on silver-zinc-lead exploration and development at its flagship Blende Project in north-central Yukon. The 100% owned property covers 5,345 hectares, is winter road accessible, and is located approximately 63 km northeast of Keno Hill, Yukon. The property lies within the Keno Hill silver district, one of Canada’s highest-grade historic silver producing districts, currently being advanced by Hecla Mining Company. The property has undergone more than $9.2 million in past exploration, including 25,195 meters of drilling in 132 drill holes.

This news release contains forward-looking statements and forward-looking information within the meaning of applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements regarding future work programs and the Company’s plans and expectations. These statements are based on assumptions management believes to be reasonable and are subject to known and unknown risks, uncertainties, and other factors, including risks related to mineral exploration and development, that may cause actual results to differ materially from those expressed or implied. Readers are cautioned not to place undue reliance on forward-looking information.

Blockchain Registration

QR Code for Blockchain Registration