Engineer Gold Mines Begins Camp Rehabilitation at Both Engineer and TAG Projects

Engineer Gold Mines has started rehabilitating its two camps in northwestern British Columbia, enabling expanded 2026 exploration programs at the Engineer and TAG projects.

Dallas Metrowire Staff
Business
Engineer Gold Mines Begins Camp Rehabilitation at Both Engineer and TAG Projects

Engineer Gold Mines Ltd. (TSX-V: EAU | OTC: EGMLF | WKN: A3EEVJ) has announced that crews, supplies, and equipment have arrived at its 100% owned Engineer Gold Project, located 30 kilometres southwest of Atlin in northwestern British Columbia. The crews are tasked with re-establishing and rehabilitating the two 20-person camps at the Engineer Mine Project and the TAG Project, which are already in place but have been unused since 2009 (TAG) and 2021 (Engineer). This move is aimed at expanding the company's 2026 exploration programs, as detailed in their July 28, 2026 news release.

The significance of this development lies in the strategic advantage it provides. Spiro Kletas, President and CEO, commented, “We are very excited to re-establish the camps at the Engineer and TAG project sites. The fact that both camps are already in place, built and paid for, is an enormous advantage for Engineer Gold Mines and our shareholders. This will allow the Company to have full teams at both sites very shortly and will enable the Company to expedite our exploration programs.”

The Engineer Gold Project encompasses approximately 18,319 hectares and is subdivided into three principal target areas: the Engineer Gold Mine, the TAG Property, and the Wann River prospect. The historic Engineer Gold Mine is a past-producing underground gold-silver operation with historical production between 1910 and 1952 totalling approximately 14,263 tonnes grading 39.4 g/t gold and 19.5 g/t silver (BC Minfile 104M014). A 2011 historical inferred mineral resource, including only the Engineer and Double Decker veins, estimated 25,000 ounces of gold at a grade of 19 g/t using a 5.0 g/t gold cut-off (Snowden, 2011, amended and restated in 2018, O’Brien et al - www.sedarplus.ca).

The TAG Property, located 6 kilometres north of the Engineer Mine, is associated with a 6 km long structurally controlled mineralized system related to splays off the Llewellyn Fault. Significant historical drill intervals include 1.7 g/t Au and 5.1 g/t Ag over 26.7 m (including 3.52 g/t Au over 4.7 m) in hole TAG06-23, 1.3 g/t Au and 5.9 g/t Ag over 35.0 m in TAG07-29, 1.8 g/t Au and 7.4 g/t Ag over 24.3 m in TAG08-51, and 1.5 g/t Au and 8.05 g/t Ag over 42.1 m in TAG08-59 (Fekete and Simper 2009, Fekete and Skinner 2007; ARIS reports #30931 and #29581).

The Wann River prospect, located 4 kilometres south of the Engineer Mine, represents an orogenic gold target associated with the Llewellyn Fault, distinct from the epithermal-style mineralization at Engineer and TAG. Exploration has identified a mineralized corridor approximately 800 by 180 metres, with a quartz grab sample returning 263 g/t gold and 1,350 g/t silver from the Lum showing (Aspinall 2011; ARIS Report #32004). Historic drilling in 2011 returned significant intercepts, including 11.3 g/t Au and 76.2 g/t Ag over 1 m in hole WR030211 and 11.3 g/t Au and 94.8 g/t Ag over 1.0 m in WR040111 (Aspinall 2011; BC ARIS Report #32478).

The rehabilitation of the camps is a critical step in advancing exploration at these targets. With the camps already built and paid for, the company can rapidly deploy teams, reducing downtime and costs. This operational efficiency is expected to accelerate the exploration programs, potentially leading to new discoveries and resource expansion. The company's ability to mobilize quickly underscores its commitment to unlocking the full potential of the Engineer Gold Project.

Blockchain Registration

QR Code for Blockchain Registration