Lahontan Gold Reports Higher-Than-Expected Grades from Santa Fe Stockpile Drilling

Lahontan Gold Corp. announced initial results from its 2026 Sonic drilling program at the Santa Fe Mine Project, confirming significant gold and silver mineralization in a historic low-grade stockpile, with grades substantially exceeding original classification, indicating potential for low-cost reprocessing.

Dallas Metrowire Staff
Business
Lahontan Gold Reports Higher-Than-Expected Grades from Santa Fe Stockpile Drilling

Lahontan Gold Corp. (TSX.V: LG) (OTCQB: LGCXF) has announced initial results from its 2026 Sonic core drilling program at the Santa Fe Mine Project in Nevada. The drilling confirmed significant gold and silver mineralization in a historic “low-grade” stockpile, with grades substantially exceeding the material’s original classification. The stockpile, adjacent to Heap Leach Pad Two, contains readily accessible material that the company believes may be suitable for low-cost future reprocessing. Cyanide-extractable gold assays averaged more than 30%, indicating favorable heap-leach characteristics.

The nearly 100-hole Sonic drilling program has concluded across the site’s four historic heap leach pads, with results from six additional holes in the low-grade stockpile expected shortly. The program is designed to define resources remaining in historic heap leach pads and stockpiles that could provide a lower-cost source of future processing material as the company advances its goal of restarting production at the Santa Fe Mine in 2027.

Lahontan Gold Corp. is a Canadian mine development and mineral exploration company that holds, through its US subsidiaries, four top-tier gold and silver exploration properties in the Walker Lane of mining-friendly Nevada. The flagship property, the 26.4 km² Santa Fe Mine project, had past production of 359,202 ounces of gold and 702,067 ounces of silver between 1988 and 1995 from open pit mines utilizing heap-leach processing.

The Santa Fe Mine has a Canadian National Instrument 43-101 compliant Indicated Mineral Resource of 1,539,000 oz Au Eq (48,393,000 tonnes grading 0.92 g/t Au and 7.18 g/t Ag, together grading 0.99 g/t Au Eq) and an Inferred Mineral Resource of 411,000 oz Au Eq (16,760,000 tonnes grading 0.74 g/t Au and 3.25 g/t Ag, together grading 0.76 g/t Au Eq), all pit constrained. The company plans to continue advancing the Santa Fe Mine project towards production, update the Santa Fe Preliminary Economic Assessment, and drill test its satellite West Santa Fe project during 2025.

The technical content of this news release has been reviewed and approved by Michael Lindholm, CPG, Independent Consulting Geologist to Lahontan Gold Corp., who is a Qualified Person as defined in National Instrument 43-101. For more information, visit the company’s website at www.lahontangoldcorp.com. The full press release is available at https://ibn.fm/a0odu.

Blockchain Registration

QR Code for Blockchain Registration